St. Bede School
6920 Edgerton Ave
Pittsburgh, PA 15208
- Summary: Renovations to various classrooms
- History:
- Requirements
A. Paint drywall Walls, ceilings and bulkheads as per Finish Schedule.
B. Paint HM Door & frames as per Door Schedule.
C. Prep & paint interior existing windows.
D. Paint accent colors as per drawings.
E. Supply and apply Dry Erase Coating in “Explore Capsule”.
F. Paint all exposed ceilings and MEPs therein.
G. Stain & varnish new wood base to match existing.
H. Properly prepare existing walls and install Wall Carpet in Teacher’s Work Room.
I. Properly prepare existing lockers and spray with High Gloss Metal Finishing Enamel. - Solution: Coordination with the other trades and staff was the key to the success of this project.